During inter-array and other offshore power cable installation operations, managing the integrity of the cables is a priority.

Our patented quadrant handling system ensures that the minimum bend radius is maintained while the cable is being over boarded. The final cable bight is deployed in one motion while maintaining tangential alignment with the stern chutes. This negates point bending of the cable and the requirement for a crane.

  • active heave compensated quadrant handling winch
  • 25 tonne SWL
  • O-loop cable path de-couples the tensioner from the carousel
  • quadrant synchronisation with the carousel
  • single operator operation.

More information?

  • grey contact icon as placeholder for photo

    Tom
    Blanchford

    Sales manager cablelay and pipelay

Vessel at sea from afar

Can we be of service?

Our experts are happy to think along with you.